Auroville's monthly news magazine 1988–2025
An interview with John Harper, By Carel
The January 2025 issue of Auroville Today focused on the aftermath of Cyclone Fengal, which breached the Lego block dam separating sections 1 and 2 of the Matrimandir Lake.
Editorial
In April this year, concerned residents of Auroville circulated a petition requesting a halt of the excavation of the Matrimandir Lake to evaluate an alternative design proposal and start an integrated development process.
An interview with Suhasini, By Alan
Recently, as there was widespread concern about what was happening with the Matrimandir lake excavation, a task force was created at a General Meeting to prepare a design brief that would frame the aesthetic, environmental, functional and technical parameters to undertake the preparation of an alternative concept design.
Feature, By Alan
In our July issue, we reported on recent developments on the site of the Matrimandir lake. These included the excavation of section two of the lake, which will be 250 metres long, more than twice the length of the existing test lake.